Once the matrix is fully put together fit the floor drain central dish and protective trap before filling with screed.
Screed wet room floor.
At longfloor our liquid cement screed offers total peace of mind once laid and finished with the final flooring coverings of your choice.
Begin to apply the fairly wet mixture making sure that the screed is well packed into the matrix sections.
It is suitable for use on solid concrete or block and beam floors.
The linear screed dec is a pre formed tapered board with a built in one way gradient which removes the uncertainty of screeding a fall within the shower area by hand.
Adjust the drain to the approximate height required and tighten by hand.
Finally float over the surface so that the ridges of the aqua grade are just visible.
The first step of the process is to choose the outlet direction you require and carefully turn the drain to face the outlet position required.
This is installed onto our hbl 50 a high build self levelling wetroom compound typically poured between 30 50mm which takes up any tolerances within the substrate.
Its not smooth which is my problem.
Take a look at our premium quality wet room floor drains for solid floors below.
When you invest in a wet room you need to be confident that your final floor is completely waterproof before a single drop of water hits it.
Hi i have a wet room made when i had a grant because of spinal problems and in it the floor is safety flooring like the kind alto do but its grooved like an embossed pattern in it.